Southern Avra Valley Forebay Reservoir & Booster Pump Station
<
>
Client: Northwest Pipe Co.
Project Name: Southern Avra Valley Forebay Reservoir & Booster Pump Station
Agency: Cross County Water Supply Corporation
Pipe Length: 2000 feet
Number of Fittings: Over 25 fittings
Pipe Diameter: 4” thru 72”
Wall Thickness: ¼” – ½” wall thickness
Lining and Coatings: Cement mortar lining, cement mortar, epoxy & tape wrap coating, polyurethane lining & coating
Oro Valley’s CAP water is delivered from the CAP canal to Tucson Water’s recharge facilities at the Central Avra Valley Storage and Recovery Project and/or the Southern Avra Valley Storage and Recovery Project. The water is then pumped into the Tucson Water distribution system and then delivered to the Oro Valley water system near Naranja and Shannon through TW’s Naranja Reservoir and Booster Station.
Copyright © 2015 Jifco, Inc.