Cross Bayou Pump Station
The $19 million Cross Bayou Pump Station, built with state and local funding, along with a $5 million donation from Shell and Motiva, is designed to keep homes and businesses dry by pumping 1,300 cubic feet of water per second out of a 12,000-acre drainage basin encompassing Destrehan and St. Rose.
<
>
Client: Northwest Pipe Co.
Project Name: Cross Bayou Pump Sta. @ Lake Pontchartrain
Agency: Louisiana DOT & Development Statewide Flood Control Program
Pipe Length: 1400 feet
Number of Fittings: 30 fittings
Pipe Diameter: 72” & 30”
Wall Thickness: 5/8” & 3/8” wall
Lining and Coatings: Coal tar epoxy lining & coating
Copyright © 2015 Jifco, Inc.