San Jacinto Valley Regional Water Reclamation Facility

Jifco was selected by PCL construction for the San Jacinto Valley RWRF project do to past expancane working with Eastern Municipal Water District and Carollo Engineering strict specifications.  This project consisted of two different sections (Plant 2 and Title 22) of the Water Treatment Plant to be built at the same time.  Jifco and its partner Northwest Pipe worked together to meet the needs of the installing contractors’ aggressive start-up schedule.  Furthermore, Jifco was selected by Flowserve Pumps to build 14 large diameter pump cans.  The pump cans were 48” thru 36” diameter and over 33 feet long.  All pump cans were fabricated and shipped to the job site within the tight fabrication tolerance of Flowserve Pumps.

Client: PCL Construction

Project Name: San Jacinto Valley RWRF

Agency: Eastern Municipal Water District

Pipe Length: 20,000 feet

 

Number of Fittings: over 1000 fittings

Pipe Diameter: 60” thru 4”

Wall Thickness: 1/2" thru 1/4” Wall Thinness

Lining and Coatings: Polyurethane Lining and Cement Mortar Coating, and Cement Mortar Lining and Cement Mortar Coating

 

 

Projects

Copyright © 2015 Jifco, Inc.