San Jacinto Valley Regional Water Reclamation Facility
Jifco was selected by PCL construction for the San Jacinto Valley RWRF project do to past expancane working with Eastern Municipal Water District and Carollo Engineering strict specifications. This project consisted of two different sections (Plant 2 and Title 22) of the Water Treatment Plant to be built at the same time. Jifco and its partner Northwest Pipe worked together to meet the needs of the installing contractors’ aggressive start-up schedule. Furthermore, Jifco was selected by Flowserve Pumps to build 14 large diameter pump cans. The pump cans were 48” thru 36” diameter and over 33 feet long. All pump cans were fabricated and shipped to the job site within the tight fabrication tolerance of Flowserve Pumps.
Client: PCL Construction
Project Name: San Jacinto Valley RWRF
Agency: Eastern Municipal Water District
Pipe Length: 20,000 feet
Number of Fittings: over 1000 fittings
Pipe Diameter: 60” thru 4”
Wall Thickness: 1/2" thru 1/4” Wall Thinness
Lining and Coatings: Polyurethane Lining and Cement Mortar Coating, and Cement Mortar Lining and Cement Mortar Coating
<
>
Copyright © 2015 Jifco, Inc.