Featured Current Projects Livermore
Client:
Project Name:
Agency:
Pipe Length:
Number of Fittings:
Pipe Diameter:
Wall Thickness:
Lining and Coatings:
City and County of San Francisco
Bay Division Pipeline 3 and 4
SFPUC
1000 feet
25 fittings
90", 84” & 72”
1/2" Wall Thinness
Polyurethane Lining and Cement Mortar Coating
Client:
Project Name:
Agency:
Pipe Length:
Number of Fittings:
Pipe Diameter:
Wall Thickness:
Lining and Coatings:
EBMUD
El Portal Reservolir & Almond
EBMUD
2400 Feet
150 fittings
36" to 6"
3/8" to 1/4"
Fusion Epoxy, Cement Coat and Lining
Client:
Project Name:
Agency:
Pipe Length:
Number of Fittings:
Pipe Diameter:
Wall Thickness:
Lining and Coatings:
Teichert Construction Co.
Feather River West Levee
Sutter Butte Flood Control Agency
4000 Feet
100 Fittings
36" to 8"
3/8"
Cement Coat and Lining, Cement Coat and Fusion Epoxy
Client:
Project Name:
Agency:
Pipe Length:
Number of Fittings:
Pipe Diameter:
Wall Thickness:
Lining and Coatings:
SSC Construction
Lloyd W. Michael WTP
Cucamonga Water District
3,200 feet
over 200 fittings
66” thru 24”
5/8" thru 1/4”
Polyurethane Lining and Cement Coating, and Cement Lining and Cement Coating
Client:
Project Name:
Agency:
Pipe Length:
Number of Fittings:
Pipe Diameter:
Wall Thickness:
Lining and Coatings:
JR Filanc Construction/GSE Construction
Phase 2 BNR / Tertiary WWTP
City of Modesto
15,000 Feet
Over 1000 Fittings
48” thru 6”
5/8” thru 3/8"
Epoxy Lining and Coatings and Cement Mortar Lining and Cement Mortar Coating
Client:
Project Name:
Agency:
Pipe Length:
Number of Fittings:
Pipe Diameter:
Wall Thickness:
Lining and Coatings:
PCL Construction
Baker WTP Project
Irvine Ranch Water District
6000 feet
500+ fittings
42" to 6" Carbon & Stainless steel
3/8" to 1/4"
Cement lining and coating, Epoxy lining and coating
Client:
Project Name:
Agency:
Pipe Length:
Number of Fittings:
Pipe Diameter:
Wall Thickness:
Lining and Coatings:
Northwest Pipe Co.
MWD Lakeview Intertie
MWD
1200 Feet
150+ fittings
42" to 3" Carbon & Stainless steel
3/8" to 1/4"
Cement lining and Coating, Epoxy lining, coating, and Coal Tar Enamel coating
Client:
Project Name:
Agency:
Pipe Length:
Number of Fittings:
Pipe Diameter:
Wall Thickness:
Lining and Coatings:
Slayden Construction Group
Lake Oswego Tigard WTP
LOTWP
6000 Feet
800 +
54" to 2 1/2" Carbon & Stainless steel
1/4" to 3/8"
Polyurethane Lining and Coating, Cement Lining and Polyurethane Coating
Client:
Project Name:
Agency:
Pipe Length:
Number of Fittings:
Pipe Diameter:
Wall Thickness:
Lining and Coatings:
McGuire & Hester Co.
Hayward Fault Pipeline
Alameda County Water District
4000 Feet
400+
50" to 6"
1/4" to 1"
Cement lining and coating, Tape wrap, Fushion Epoxy, and Epoxy
Copyright © 2015 Jifco, Inc.